Part 3 · Running the move · Recipe 14 of 22

Pick the right chassis and avoid a split

The wrong chassis means a wasted trip. A chassis in the wrong place means a split.

Jonathan Sinton Jonathan Sinton · Checked November 14, 2026

You need

  • Container size and weight
  • Whether the terminal is wheeled or grounded
  • Which pool or provider you may use
  • Where that chassis is

Steps

  1. Match the size20, 40 or 45 ft. An extendable chassis covers more than one size.
  2. Check the weightA heavy 20 ft may need a tri-axle. See recipe 8.
  3. Ask who supplies itYour own, a pool, or one the ocean carrier provides. This also decides who pays the daily rate.
  4. Find out where it isIf the chassis is not at the terminal where the box is, the extra trip to get it is a chassis split.
  5. Inspect before you leaveBrakes, lights, tires, twist locks. Report defects before the gate, not after.

Watch out

Chassis days keep running while the box sits at the customer.
Return the chassis where the provider wants it, or you pay again to move it.

Look it up

Chassis and pools Chassis split Wheeled operation Grounded operation

Start free. Upgrade when you grow.

100 quotes a month, no credit card, and a free 30-minute onboarding call.

Start free → Book a demo